We Fabricate & Install Premium Grade Architectural Millwork to Green Specifications
Press


  PERSPECTIVE NEW YORK 2009 - GREEN BUILDING WINNER - 1ST PLACE
 
 
Profile: Located at 230 Park Avenue, the Northeast quadrant of the 13th, 14th, and 15th floors comprised of 18,888 RSF.  Interior installation of executive expansion area consisting of perimeter executive private offices and interior administrative support offices.

LEED Designation:  LEED Gold Cerification
Client: ING Investment Management
Architect: Ted Moudis Associates
Project Design Engineer:  Robert Derector Associates
Commissioning Authority: AKF Group LLC
General Contractor: Americon Construction
Specialty/Green Consultant: YRG
Lighting Consultant: Syska Lighting Group
Millwork: Island Architectural Woodwork, Inc.
 
Sustainability Factors:  The space's more traditional design utilized cherry wood wainscot and lacquered raised panels.  Island Architectural Woodwork incorporated 96% of all wood materials from certified Forest Stewardship Council sources, which is above the required standards essential to procuring materials.  All construction materials used were comprised of approximately 33% recycled content and over 61% of these materials supported local/regional manufacturing, which reduces excessive transportation green house emissions.  Also, over 50% of the construction and demolition waste was sent to recycling facitlities.  The team focused on reducing ING's energy consumption.  TMA was able to reduce the lighting power densities to 35% below the ASHRAE standard by using efficient lighting designs with low wattage, energy-smart fixtures.  Additionally, over 90% of the equipment and appliances in the space are Energy Star rated.  All of the above are just some of the many aspects that helped ING achieve this LEED Gold Certification.
 
Check out our Gallery of Work also check out the Design Solutions Article.